As required by the State Water Resources Control Board (SWRCB), construction activity resulting in a land disturbance of 1 acre or more of soil, or whose projects are part of a larger common plan of development that in total disturbs more than 1 acre, required to obtain coverage under the Construction General Permit Order 2009-0009-DWQ adopted on September 2, 2009, National Pollutant Discharge Elimination System (NPDES), General Permit No. CAS000002: Waste Discharge Requirements (WDRS) for Discharges of Storm Water Runoff Associated with Construction Activity (General Permit).